Building towards Bonneville… Part Three
Written By Jim Lindsay
Here is part 3, getting to the point of having it running.
This was 2014, and Speedweek rained out. I did however, take it to Woodburn Dragstrip just to make sure the "air shifted" transmission would shift all 4 gears. I like the shots, after all the Tig welding (and there was plenty) of me painting the chassis in Marty’s driveway!
(Click on image to see FULL SIZE)