Building towards Bonneville… Part Three

Here is part 3, getting to the point of having it running.

This was 2014, and Speedweek rained out. I did however, take it to Woodburn Dragstrip just to make sure the "air shifted" transmission would shift all 4 gears. I like the shots, after all the Tig welding (and there was plenty) of me painting the chassis in Marty’s driveway!

(Click on image to see FULL SIZE)

Previous
Previous

Building towards Bonneville… Part Four

Next
Next

Building towards Bonneville… Part Two